2026 Honor Award
General Design
Waterfront Park
Seattle, WA
Landscape Architect:
Field Operations
Project Team:
- Jacobs
Photo Credit(s):
Images 01, 03, 14: © Erik Holsather, courtesy of Friends of Waterfront Seattle
Image 02: © Field Operations
Images 04-09, 11: © Caitlin Atkinson
Image 10: © Jean Sherrard (left), Hoffman Construction / Marissa Lordahl (right)
Image 12: © Jo Cosme, courtesy of Friends of Waterfront Seattle
Image 13: © Brandon Patoc, courtesy of Friends of Waterfront Seattle
About the Project:
Waterfront Park reconnects Seattle with its waterfront for the first time since 1949. Following the removal of the Alaskan Way Viaduct and seawall reconstruction in 2019, the 1.5-mile urban framework plan establishes character zones, nodes, and linkages that honor adjacent neighborhood identities while capitalizing on unique waterfront conditions.
A generous pedestrian promenade forms the core of the project. Reclaiming the waterfront and reconnecting the city with Elliott Bay, the project includes a new infrastructure corridor, green street, and significant public spaces and amenities, including integrated stormwater management, native-based gardens, kiosks and wayfinding, historic railings, redesigned piers, and new pedestrian connections.
Set within breath-taking vistas across the Bay, Mount Rainier, and the city, the Park is Seattle’s new “Front Porch.” Extending 26 blocks, from historic Pioneer Square to Belltown, Waterfront Park reconnects downtown, Pike Place Market, and various neighborhoods to the Bay. The dramatic Overlook Walk reconnects Pike Place Market to the Seattle Aquarium, Piers 58 and 62, and the Historic Piers along the waterfront.
Inspired by the tough, working character of the once-industrial waterfront with the soft, natural palette of Elliott Bay and Puget Sound, the design reflects the rich cultural history of Seattle’s waterfront—embracing its broader natural setting while seamlessly connecting into the urban fabric of the city.
Waterfront Park began as a bold community vision to remove the Alaskan Way Viaduct and reconnect the city to its shoreline. Today, the $1.2 billion, 15-year transformation has delivered a vibrant, inclusive, and climate-resilient waterfront that reflects Seattle’s identity—welcoming Seattleites and all.
Special Factors & Additional Information:
Community and Indigenous Engagement: Community engagement guided all aspects of the project to create “A Waterfront for All.” Partnerships with Coast Salish people informed the design, plant selection, cultural storytelling, interpretive signage, and public art that honors indigenous heritage which was once home to fishing villages and trade routes.
Collaborative Art Plan: A collaborative Art Plan engaged artists from the start, allowing them to select sites, media, and themes. This plan ensured art was seamlessly integrated into the design vision.
Ecological Restoration: Ekki wood from the original seawall was salvaged for handrails, and benches were crafted from reclaimed Western Red Cedar. Creosote-treated pilings were removed from the Seawall, Pier 58, and Pier 62 to improve water quality. Stormwater runoff from the promenade is partially routed to bioretention planters with seasonal plantings that tolerate periodic flooding, slowing and filtering water before it enters the municipal system.
