2026 Merit Award

Un-built Projects

800 Monroe Resiliency Park

Hoboken, NJ

Landscape Architect:

AECOM LAUD NYC

Project Team:
  • City of Hoboken
Hoboken Monroe_AECOM

Photo Credit(s):

Images 1, 3-5, 7-11, 13-14: AECOM LAUD NYC
Image 2: AECOM LAUD NYC / Getty / Hudson County News / Caitlin Ursini
Images 6, 12: AECOM LAUD NYC / Wikipedia

About the Project:

800 Monroe Resiliency Park is a neighborhood-scale public landscape designed to function as flood mitigation infrastructure within Hoboken’s broader resilience strategy. Located in a low-lying area that experiences recurrent tidal and rainfall flooding, the project responds to both environmental risk and a long-standing lack of accessible open space in a dense urban neighborhood. The park is conceived as a piece of civic infrastructure that performs during extreme weather events while supporting everyday public life.

Hoboken’s citywide approach to flood risk management is organized around the principles of delay, store, and discharge. 800 Monroe Resiliency Park advances this framework by integrating stormwater infrastructure directly into the public realm rather than separating it as a purely technical system. Subsurface storage and controlled discharge are embedded beneath flexible lawns, recreation areas, and circulation paths, allowing the site to detain significant volumes of stormwater during storm events while remaining functional under normal conditions. Flood infrastructure serves as the organizing structure of the site, shaping grades, circulation, and program rather than constraining them.

The site plan emphasizes clarity, adaptability, and long-term durability. Program elements are deliberately located above resilient infrastructure, and circulation routes are designed with accessible grades and materials that remain usable during and after flooding. Flexible lawns and plazas accommodate informal play, community gatherings, and seasonal events, while shaded seating areas improve comfort in warmer months.
Active recreation areas are positioned to balance daily use with maintenance needs and flood performance requirements, reinforcing the park’s role as both neighborhood amenity and infrastructure asset.

Planting strategies support ecological performance and civic use. Layered canopy, understory, and groundcover planting provide shade, habitat, and visual buffering while contributing to stormwater management and microclimate moderation. Species selection prioritizes durability, seasonal variation, and low maintenance within a coastal community, ensuring the landscape can adapt over time as conditions change.

Community engagement was treated as a structured component of the planning and design process rather than a parallel activity. Public workshops, surveys, and open houses were paired with physical and visual tools, including a site model, to test program priorities, circulation options, and design tradeoffs. Feedback informed refinements to the site layout, amenities, and access points, helping to align neighborhood needs with technical feasibility and citywide resilience goals. Engagement functioned as a design check, reinforcing accountability and buildability.

As an unbuilt project, 800 Monroe Resiliency Park demonstrates how flood mitigation infrastructure can be integrated into everyday public landscapes. The project offers a replicable approach for urban environments seeking to address climate risk through multi-functional open space that balances technical performance, public access, and long-term adaptability.

Scroll to Top